Secured Trading Service

CE Approval Explosion Proof Chemical Fume Hood for Food Inspection

Chengdu Ample Import and Export Co., Ltd.
  • Audited Supplier
  • 5 yrs

Contact Supplier

Product Highlights

  • Explosion Proof Safety: Designed for safe handling of hazardous materials with fireproof and explosion-proof features.
  • Corrosion Resistant Material: Constructed with stainless steel and ceramic components for acid, alkali, and heat resistance.
  • Customizable Dimensions: Available in standard sizes with customizable worktop and liner materials to fit specific needs.
  • Precise Velocity Control: Features manual control system to maintain average surface air speed between 0.6-0.8 m/s.
  • High Efficiency Purification: Equipped with spray sodium hydroxide solution system for effective chemical gas purification.
  • LED Illumination System: Includes adjustable white and UV-free yellow LED lamps with intensity not less than 700 Lux.
  • Low Noise Operation: Operates quietly with noise levels kept within 55 decibels for a safe working environment.
  • CE Approval Certified: Meets international safety standards with CE approval for chemical fume hood applications.

Shipping

Shipping Cost:
Contact the supplier about freight and estimated delivery time.

Online Trading Protection

Payment Guarantee
T/T PayPal ApplePay GooglePay visa mastercard american express discover JCB diners club PIX SPEI OXXO PSE OZOW Platform-protected payments with refund support for eligible order issues.
Platform Logistics
Clearer shipment tracking with platform-supported logistics.
Inspection Service
Optional pre-shipment inspection for quality and quantity checks.
After-Sales & Dispute Handling
Platform-assisted dispute resolution, including refunds or returns when applicable.

Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.

Product Images of CE Approval Explosion Proof Chemical Fume Hood for Food Inspection

CE Approval Explosion Proof Chemical Fume Hood for Food Inspection
CE Approval Explosion Proof Chemical Fume Hood for Food Inspection pictures & photos
CE Approval Explosion Proof Chemical Fume Hood for Food Inspection
CE Approval Explosion Proof Chemical Fume Hood for Food Inspection pictures & photos
CE Approval Explosion Proof Chemical Fume Hood for Food Inspection
CE Approval Explosion Proof Chemical Fume Hood for Food Inspection pictures & photos
CE Approval Explosion Proof Chemical Fume Hood for Food Inspection
CE Approval Explosion Proof Chemical Fume Hood for Food Inspection pictures & photos
CE Approval Explosion Proof Chemical Fume Hood for Food Inspection
CE Approval Explosion Proof Chemical Fume Hood for Food Inspection pictures & photos
CE Approval Explosion Proof Chemical Fume Hood for Food Inspection
CE Approval Explosion Proof Chemical Fume Hood for Food Inspection pictures & photos
CE Approval Explosion Proof Chemical Fume Hood for Food Inspection
  • CE Approval Explosion Proof Chemical Fume Hood for Food Inspection
  • CE Approval Explosion Proof Chemical Fume Hood for Food Inspection
    CE Approval Explosion Proof Chemical Fume Hood for Food Inspection
  • CE Approval Explosion Proof Chemical Fume Hood for Food Inspection
    CE Approval Explosion Proof Chemical Fume Hood for Food Inspection
  • CE Approval Explosion Proof Chemical Fume Hood for Food Inspection
    CE Approval Explosion Proof Chemical Fume Hood for Food Inspection
  • CE Approval Explosion Proof Chemical Fume Hood for Food Inspection
    CE Approval Explosion Proof Chemical Fume Hood for Food Inspection
  • CE Approval Explosion Proof Chemical Fume Hood for Food Inspection
    CE Approval Explosion Proof Chemical Fume Hood for Food Inspection
  • CE Approval Explosion Proof Chemical Fume Hood for Food Inspection
    CE Approval Explosion Proof Chemical Fume Hood for Food Inspection

Find Similar Products

Product Description

 
Product Description

A laboratory fume hood is a ventilated enclosure where hazardous materials can be    handled safely. The purpose of the hood is to contain contaminants and prevent their  escape into the laboratory. This is accomplished by drawing (by air flow) contaminants within the hood's work area away from the user thereby preventing and minimizing inhalation and contact with hazardous materials.

To create airflow into the hood, an exhaust blower "pulls" air from the laboratory room into and through the hood and exhaust system . A baffle, airfoil, and other aerodynamically designed components control the patterns of air moving into and through the hood.

Fume Hoods must be located away from heavy traffic aisles and doorways so that persons  exiting the lab do not have to pass in front of the fume hood. The potentially dangerous portion of an experiment is usually conducted in a fume hood. Many lab fires and explosions originate in fume hood and a fume hood located adjacent to a path of egress could trap someone in the lab.

There must be two exits from rooms where new fume hoods are to be installed. If this is not feasible, the fume hood must be situated on the side of the room furthest from the   door. A fire or chemical hazard, both of which often start in a fume hood, can render an exit impassible. For this reason, all labs with fume hoods are required to maintain two unblocked routes of egress.

Product Parameters
 
                Model Specification   WJ-1500A WJ-1500B WJ-1800A WJ-1800B
External dimensions of equipment(mm) 1500(W)*1205 (D) *2400 (H) 1800(W)*1205 (D) *2400 (H)
Dimension of works pace (mm) 1260(W1)*780(D1) *1100 (H1) 1560(W1)*780(D1) *1100 (H1)
Panel material 20+6mm thick butterfly ceramics
Material of internal lining board 5mm thick ceramic fiber board
Diversion structure Lower air return
Control system Button control panel (LCD panel)
PH value control The medium is alkaline water solution; manual monitoring, and manual control through acid pump and alkali pump.
Input power Three-phase five-wire 380V/50A
Current for air fan Not over 2.8A(380V or 220V can be directly connected)
Maximum load of socket 12 KW(total of 4 sockets)
Water tap 1 set (remote control valve + water nozzle) No 1 set (remote control valve + water nozzle) No
Water discharge way Magnetic chemical pump strong discharge
Using environment For non-explosion indoor use, within 0-40 degrees Celsius.
Applicable fields Inorganic chemistry experiment; Food, medicine, electronics, environment, metallurgy, mining, etc.
Ways of Purification Spray sodium hydroxide solution, no less than 8 cubic meters/hour Spray sodium hydroxide solution.no less than 12 cubic meters/ hour
Ways of surface air speed control Manual control (through the electric air valve to adjust the exhaust air volume or adjust the height of the moving door)
Average surface air speed 0.6-0.8 m/s Exhaust air volume: 1420-1890m3/h (when door height h =500mm) 0.6-0.8 m/s Exhaust air volume: 1760-2340m3/h (when door height h =500mm)
Speed deviation of surface air Not higher than 10%
The average intensity of illumination Not less than 700 Lux; Standard white and uv-free yellow LED lamps; The illumination is adjustable.
Noise Within 55 decibels
Flow display White smoke can pass through the exhaust outlet, no overflow.
Safety inspection No spikes, edges; Charged body and the exposed metal resistance is greater than 2 mQ; Under 1500V voltage, no breakdown or flashover occurred for 1min test.
Resistance of exhaust cabinet Less than 160 pa
Power consumption Less than 1.0kw/h (excluding power consumption of fans and external instruments) Less than 1.2kw/h (excluding power consumption of fans and external instruments)
Water consumption Less than 3.2L/ h Less than 4.0L/ h
Performance of wind compensation With a unique wind compensation structure, the volume of the wind will not cause turbulence in exhaust cabinet and will not directly blow to the staff (need to connect to the air compensation system of the laboratory)
Air volume regulating valve 315mm diameter flanged type anti-corrosion electric air flow regulating valve (electric contact actuator)
 
Installation Instructions

•Fume hoods should be located within the laboratory to avoid cross currents at the fume hood face due to heating cooling, or ventilation supply or exhaust diffusers.Cross currents outside a hood can nullify or divert air flow onto a hood, negatively affecting its capture ability.

•Sufficient makeup air must be available within the laboratory to permit fume hoods to operate at their specified face velocities. A fume hood exhausts a substantial amount of air. Therefore, additional makeup air must be brought onto the room to maintain a proper air balance.

• Windows in labs that have fume hoods must be fixed closed. Breezes coming in through open lab windows can adversely affect the proper functioning of the hood. Turbulence caused by these wind currents can easily bring the contaminated air inside the hood back into the laboratory.

•Safety devices such as deluge showers, eye wash stations, fire extinguishers, and fire blankets should be located convenient to the fume hood operating personnel.

•Fume hoods shall not have an on/off control accessible in the laboratory, unless the lab has an alternate exhaust ventilation system or the exhaust is being filtered through a charcoal or HEPA filter. Fume hoods are an integral part of the entire laboratory's air balancing system which must be maintained. Labs must be maintained under positive pressure and when a fume hood is turned off the lab can develop positive pressure.

Detailed Photos
      
CE Approval Explosion Proof Chemical Fume Hood for Food Inspection
CE Approval Explosion Proof Chemical Fume Hood for Food Inspection
 
CE Approval Explosion Proof Chemical Fume Hood for Food Inspection
CE Approval Explosion Proof Chemical Fume Hood for Food Inspection

Usage Attention

Ensure Eye Protection Is Available
Make sure the proper eye protection is available and that all fume hood users are wearing it. Even when the sash is in place, users should still wear eye protection when handling chemicals inside the fume hood.

Make Sure Motion Is Limited
Before and during the use of the fume hood, check to make sure there is limited motion around and in front of the hood while you're working. Excess movement could cause the fume hood to vibrate and disrupt airflow.

Make Sure Baffles Aren't Blocked
Double check that baffles or exhaust slots are not blocked while working in the fume hood. This could prevent air from flowing into and out of the hood.
 
Keep Materials Away From Sash
All materials should be at least 6 inches from the sash opening inside of the hood.

Clean Spills Immediately
If a splash occurs, wipe clean the glass on the fume hood.

Fume Hood Maintenance


Ensure Users Are Properly Trained
Although this item isn't one that will necessarily require action every day, it serves as a good reminder that all employees should be up to date on proper use of the equipment.

This is especially true in large facilities since employees may come and go. It's essential to ensure anyone new who comes on board is fully trained in operating the fume hood. Any current employees should regularly undergo refresher training, especially if a new chemical is being used under the hood.

Know The Chemicals
Before using the fume hood, users should understand the potential reactions of the chemicals they are working with, such as whether the chemicals could explode, liquefy or evaporate under certain circumstances.

If users are unsure of these potential reactions, they should refer to the chemical's Material Safety Data Sheet for more information.

Ensure Sash Is Opened To Proper Height
The fume hood sash should be opened to the proper operating height. If the sash is too high, there is not enough of a barrier between the user and the chemicals to provide protection. The proper height is usually indicated by a set of arrows located on the frame.

About the Supplier

This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASR238059". Items marked "verified" are certified.

Watch Video
Watch Video
Chengdu Ample Import and Export Co., Ltd.
Chengdu Ample Import and Export Co., Ltd.
Chengdu Ample Import and Export Co., Ltd.
Chengdu Ample Import and Export Co., Ltd.
Chengdu Ample Import and Export Co., Ltd.
Chengdu Ample Import and Export Co., Ltd.
Chengdu Ample Import and Export Co., Ltd.
Chengdu Ample Import and Export Co., Ltd.

About Our Factory & Business Background

Address
No. 11, 11th Floor, Unit 2, Building 2, No. 1, Section 1, Huayang Huafu Avenue, Tianfu New District, Chengdu, Sichuan, China
Terms of Payment
LC, T/T, PayPal, Western Union, Small-amount payment, Money Gram
International Commercial Terms(Incoterms)
FOB, EXW, CIF
Average Lead Time
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main Products
Chemical Fume Hood, Laboratory Fume Hood, Duct Fume Hood, Laboratory Furniture, Laboratory Storage Cabinet, Laboratory Equipment, Hospital Bed, Medical Device, Oxygen Concentrator, Veterinary Medical Equipment

Our Industry Experience & Global Business Record

Export Year
2019-07-01
Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

FAQ

What is the material of the fume hood?
The main material is stainless steel, with a worktop made of 20+6 mm thick butterfly ceramics and an internal lining of 5mm thick ceramic fiber board.
Is the product customizable?
Yes, the product is customizable. Options include specific product names, worktop materials, liner materials, input power, and face velocity.
What is the input power requirement?
The input power is three-phase five-wire 380V/50A, with a maximum load of 12 KW for sockets.
How is the air speed controlled?
Air speed is controlled manually through an electric air valve to adjust exhaust volume or by adjusting the height of the moving door.
What is the maximum noise level?
The noise level is within 55 decibels during operation.
What are the applicable fields for this hood?
It is suitable for inorganic chemistry experiments, food, medicine, electronics, environment, metallurgy, mining, and biology labs.
What is the lead time for delivery?
During peak season, the lead time is one month. During off-season, it is within 15 workdays.
What payment terms are accepted?
Accepted payment terms include LC, T/T, PayPal, Western Union, Small-amount payment, and Money Gram.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now